Questions 701–710 of 730. Imported answers require independent review unless marked reviewed.

Topic practice 730 questionsPage 71 of 73

Question 36

Open question
ARNAT2 marksNeeds review
Diagram for Architecture and Planning question 36

For a symmetrical two dimensional truss as shown in the above figure, vertical force in kN acting on the member PQ is ________

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 37

Open question
ARNAT2 marksNeeds review
Value of bending moment in kN-m at point C for a beam as shown in the above figure is ________
Diagram for Architecture and Planning question 37


Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 38

Open question
ARNAT2 marksNeeds review
Fee of contractor for a project has the following provisions • Basic fee = 15% of actual cost of work incurred • Bonus = 20% of savings from estimated cost of work • Penalty = 20% of cost overrun If the estimated cost of the project is Rs. 60,000, and the actual cost is Rs. 70,000, then the total fee of contractor in Rupees is ________

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 39

Open question
ARNAT2 marksNeeds review
A site has a unidirectional slope of 30° with horizontal along its longer side. The projected dimensions of the site on the horizontal plane measures 30 m × 40 m. Using cut and fill method the site has to be leveled parallel to the horizontal plane. The minimum amount of earth to be excavated in cubic metre is ________

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 40

Open question
ARNAT2 marksNeeds review
The optimistic, most-likely and pessimistic time for developing a new product are 12 months, 15 months and 17 months, respectively. Calculate the expected time in months.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 41

Open question
ARNAT2 marksNeeds review
A circular plate inclined at an angle θ with horizontal plane generates an ellipse as top view with major axis and minor axis of 5 cm and 2.5 cm respectively. The value of θ in degrees is ________

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 42

Open question
ARNAT2 marksNeeds review
Calculate the volume of cement in cubic metre required for making 10 cubic metre of M20 grade Plain Cement Concrete work, assuming the ratio of dry concrete mix to wet concrete mix as 1.52.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 43

Open question
ARNAT2 marksNeeds review
One acre of agricultural land has been given on a lease till perpetuity at an annual rent of Rs. 10,000 to be paid at the end of each year. Net Present Value of the land parcel in Rupees assuming a discount rate of 5% per annum is ________

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 44

Open question
ARNAT2 marksNeeds review
In year 2001, a district with 4,000 manufacturing jobs had a 10% share of total manufacturing jobs within the state. In year 2011, the state recorded 15% drop in manufacturing jobs whereas share of the district in total manufacturing jobs within the state increased to 15%. Additional manufacturing jobs created in the district between year 2001 and 2011 is ________

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 45

Open question
ARMCQ2 marksNeeds review
Match the parameters in Group I with their units in Group II
Group I (P) Traffic flow (Q) Traffic density (R) Right of Way (S) Traffic signal cycle length
Group II
Metre
Cycles/second
Seconds
Vehicle/km
PCU/hr
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer