Question 21
Open questionCENAT1 markNeeds review
is equal to ____________Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 21
Open questionCE-2NAT1 markNeeds review
A sheet pile has an embedment depth of 12 m in a homogeneous soil stratum. The coefficient of permeability of soil is
m/s. Difference in the water levels between the two sides of the sheet pile is 4 m. The flow net is constructed with five number of flow lines and eleven number of equipotential lines. The quantity of seepage (in cm
/s per m, up to one decimal place) under the sheet pile is ________.Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 22
Open questionCENAT1 markNeeds review
A 3 m thick clay layer is subjected to an initial uniform pore pressure of 145 kPa as shown in the figure.

For the given ground conditions, the time (in days, rounded to the nearest integer) required for 90% consolidation would be ____________
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 22
Open questionCE-2NAT1 markNeeds review
The VPI (vertical point of intersection) is 100 m away (when measured along the horizontal) from the VPC (vertical point of curvature). If the vertical curve is parabolic, the length of the curve (in meters and measured along the horizontal) is ________.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 23
Open questionCENAT1 markNeeds review
A triangular pipe network is shown in the figure.

The head loss in each pipe is given by
, with the variables expressed in a consistent set of units. The value of
for the pipe
is 1 and for the pipe
is 2. If the discharge supplied at the point
(i.e., 100) is equally divided between the pipes
and
, the value of
(up to two decimal places) for the pipe
should be ____________Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 23
Open questionCE-2NAT1 markNeeds review
During a storm event in a certain period, the rainfall intensity is 3.5 cm/hour and the
-index is 1.5 cm/hour. The intensity of effective rainfall (in cm/hour, up to one decimal place) for this period is ________.Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 24
Open questionCENAT1 markNeeds review
The ordinates of a 2-hour unit hydrograph for a catchment are given as:
Time (h) | 0 | 1 | 2 | 3 | 4 |
|---|---|---|---|---|---|
Ordinate (m³/s) | 0 | 5 | 12 | 25 | 41 |
The ordinate (in m³/s) of a 4-hour unit hydrograph for this catchment at the time of 3 h would be ________.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 24
Open questionCE-2NAT1 markNeeds review
The infiltration capacity of a soil follows the Horton’s exponential model,
. During an experiment, the initial infiltration capacity was observed to be 200 mm/h. After a long time, the infiltration capacity was reduced to 25 mm/h. If the infiltration capacity after 1 hour was 90 mm/h, the value of the decay rate constant,
(in h
, up to two decimal places) is ________.Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 25
Open questionCENAT1 markNeeds review
Vehicles arriving at an intersection from one of the approach roads follow the Poisson distribution. The mean rate of arrival is 900 vehicles per hour. If a gap is defined as the time difference between two successive vehicle arrivals (with vehicles assumed to be points), the probability (up to four decimal places) that the gap is greater than 8 seconds is ________.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 25
Open questionCE-2NAT1 markNeeds review
While aligning a hill road with a ruling gradient of 6%, a horizontal curve of radius 50 m is encountered. The grade compensation (in percentage, up to two decimal places) to be provided for this case would be ________.
Log in to check the answer