Questions 11–20 of 44. Imported answers require independent review unless marked reviewed.

Topic practice 44 questionsPage 2 of 5

Question 63

Open question
ce-1NAT2 marksNeeds review
The figure presents the trajectories of six vehicles within a time-space domain. The number in the parentheses represents unique identification of each vehicle.
Diagram for Civil Engineering question 63

The mean speed (in km/hr) of the vehicles in the entire time-space domain is ______________ (rounded off to the nearest integer).

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 46

Open question
CEMCQ2 marksNeeds review
A plot of speed-density relationship (linear) of two roads (Road A and Road B) is shown in the figure.
Diagram for Civil Engineering question 46

If the capacity of Road A is C_A and the capacity of Road B is C_B, what is

?
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 50

Open question
CE-2MSQ2 marksNeeds review
The figure presents the time-space diagram for when the traffic on a highway is suddenly stopped for a certain time and then released. Which of the following statements are true?
Diagram for Civil Engineering question 50

Your answerSelect all correct options. You can choose more than one.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 28

Open question
CEMSQ1 markNeeds review
For a traffic stream,

is the space mean speed,

is the density,

is the flow,

is the free flow speed, and

is the jam density. Assume that the speed decreases linearly with density.
Which of the following relation(s) is/are correct?
Your answerSelect all correct options. You can choose more than one.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 44

Open question
CEMCQ2 marksNeeds review
Consider the four points P, Q, R, and S shown in the Greenshields fundamental speed-flow diagram. Denote their corresponding traffic densities by

,

,

, and

, respectively. The correct order of these densities is
Diagram for Civil Engineering question 44

Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 44

Open question
CEMCQ2 marksNeeds review
A single-lane highway has a traffic density of 40 vehicles/km. If the time-mean speed and space-mean speed are 40 kph and 30 kph, respectively, the average headway (in seconds) between the vehicles is
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 62

Open question
CENAT2 marksNeeds review
A two-phase signalized intersection is designed with a cycle time of 100 s. The amber and red times for each phase are 4 s and 50 s, respectively. If the total lost time per phase due to start-up and clearance is 2 s, the effective green time of each phase is _____s. (in integer)

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 63

Open question
CENAT2 marksNeeds review
At a traffic intersection, cars and buses arrive randomly according to independent Poisson processes at an average rate of 4 vehicles per hour and 2 vehicles per hour, respectively. The probability of observing at least 2 vehicles in 30 minutes is ______. (round off to two decimal places)

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 63

Open question
CENAT2 marksNeeds review
Assuming that traffic on a highway obeys the Greenshields model, the speed of a shockwave between two traffic streams (P) and (Q) as shown in the schematic is ______ kmph. (in integer)
Diagram for Civil Engineering question 63


Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 64

Open question
CENAT2 marksNeeds review
The vehicle count obtained in every 10 minute interval of a traffic volume survey done in peak one hour is given below.
Time Interval (in minutes)
Vehicle Count
0 – 10
10
10 – 20
11
20 – 30
12
30 – 40
15
40 – 50
13
50 – 60
11
The peak hour factor (PHF) for 10 minute sub-interval is ________. (round off to one decimal place)

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer