Questions 321–330 of 348. Imported answers require independent review unless marked reviewed.

Topic practice 348 questionsPage 33 of 35

Question 10

Open question
MNMCQ1 markNeeds review
Minerals A and B are produced from a deposit. Minerals A and B will be called coproducts if
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 11

Open question
MNMCQ1 markNeeds review
Semi-variogram modeling is used for reserve estimation of mineral deposit by
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 12

Open question
MNMCQ1 markNeeds review
Which one of the following does NOT belong to the direct operating cost of a mine?
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 13

Open question
MNMCQ1 markNeeds review
Lane's algorithm is applied to determine
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 14

Open question
MNMCQ1 markNeeds review
In an underground coal mine a driller, wearing personal protective equipment, was going to workplace along the traveling roadway. A piece of rock fell down from the roof and hit the person on head causing serious injury. The cause of accident is
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 15

Open question
MNMCQ1 markNeeds review
In a PERT network, the “time estimates” of an activity are the following: Optimistic time - 2 days, Most likely time - 4 days, and Pessimistic time - 12 days. The expected time and standard deviation of the activity in days are respectively
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 17

Open question
MNMCQ1 markNeeds review
A vertical photograph of a 40 m high hill is taken from 4.4 km height. If the focal length of the camera is 15 cm, the scale of the photograph is ________
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 20

Open question
MNMCQ1 markNeeds review
A deeply seated ore body dips at 70° having an average width of 60 m. The ore body, hanging wall, and footwall are competent. The suitable stoping method for this ore body is
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 21

Open question
MNMCQ1 markNeeds review
The results of the crossing point temperature experiments for coal A and B are shown in the figure.
Diagram for Mining Engineering question 21

The correct interpretation of the plot is that
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 22

Open question
MNMCQ1 markNeeds review
The “yellow boy” formed due to acid mine drainage mainly consists of
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer