The areas within the contour lines of a proposed site for an overburden dump are as follows:
| Contour RL (m) | Area (m²) |
| 195 | 3054 |
| 180 | 3025 |
| 165 | 2095 |
| 150 | 2008 |
| 135 | 2000 |
| 120 | 1992 |
The total volume of overburden in cubic meter that could be dumped within the 120 m and 195 m contour levels is
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 31
Open questionMNNAT2 marksNeeds review
Total ore mined from a sub-level open stope of a copper deposit is measured to be 10000 tonne. The ore recovery and ore dilution during stoping are 90% and 20% respectively. The in situ Cu grade of the ore in the stope is 0.65%. The selling price of copper is Rs. 400/kg of metal. Ignoring any other metal losses in the downstream process of the ore, the revenue generated by selling the ore in Crores of rupees is
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 32
Open questionMNNAT2 marksNeeds review
The block grade model of an ore deposit is shown in the figure below.

The relationship between block value per tonne (
) in rupees and the block grade in percentage (
) is given below:
, for
, otherwiseIf each square block contains 1000 tonne of material and the overall pit slope angle is
, the total value of the pit determined by the floating cone algorithm in Lakhs of rupees isLog in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 33
Open questionMNNAT2 marksNeeds review
A mine is being developed by bord and pillar method with a gallery size of 4.8 m × 2.4 m. The mine operates in 3 shifts per day and 6 faces are blasted per shift. The average pull per round of blast is 1.2 m and the bulk density of coal is 1.4 t/m³. If the OMS is 2.5, then the average manpower deployed in the development section per shift is
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 34
Open questionMNNAT2 marksNeeds review
Consider the following linear programming problem:
Maximize
Subject to
The maximum value of the objective function is
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 35
Open questionMNNAT2 marksNeeds review
A mining company having three mines A, B and C supplies coal to three power plants P, Q and R located close to the mines. The daily production capacities of the three mines in tonnes are 700, 1200, and 1100 respectively. The daily requirements at the power plants in tonnes are 1000, 1000, and 1000 respectively. The transportation costs in rupees per tonne is given in the matrix below:
| Mine / Power plant | P | Q | R |
| A | 15 | 20 | 60 |
| B | 5 | 40 | 20 |
| C | 30 | 10 | 50 |
The total cost of coal transportation in rupees from the three mines to the power plants using the least-cost method is
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 36
Open questionMNNAT2 marksNeeds review
The series-parallel configuration of a system, consisting of 6 independent components A, B, C, D, E, and F with their individual reliability, is shown in the figure:

The reliability of the system is
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 37
Open questionMNNAT2 marksNeeds review
500 coal miners were randomly selected from an underground coal mine. It was found that 50 workers experienced an injury in the year 2014. The distribution of injury based on younger age group (age ≤ 40 years) and older age group (age > 40 years) generated the following cross classification table.
| Age group | Injured | Non-injured | Row total |
| Younger age group | 20 | 130 | 150 |
| Older age group | 30 | 320 | 350 |
| Column total | 50 | 450 | 500 |
The odds of injury for the younger age group compared to the older age group is
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 38
Open questionMNNAT2 marksNeeds review
A bord and pillar panel is being planned at a depth of 300 m. The dimension of square pillar is 35 m centre-to-centre. The average unit weight of the overburden rock is 25 kN/m³. If the strength of the pillar is 14.0 MPa, the gallery width in m for a safety factor of 1.3 is
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 39
Open questionMNNAT2 marksNeeds review
A sandstone sample having 15% moisture content and volume of 75 cm³ weighs 180 g. If the grain density is 2.6 g/cm³, porosity of the sample in % is
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer