Questions 11–20 of 23. Imported answers require independent review unless marked reviewed.

Topic practice 23 questionsPage 2 of 3

Question 28

Open question
MNMCQ1 markNeeds review
A mining company produces iron ore and sells to another company. Royalty to be paid is on the basis of
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 61

Open question
MNNAT2 marksNeeds review
The net present values (NPV) of two mining project proposals A and B are as given.


where,

is discount rate.
The required rate of return for which both the proposals have equal possibility of acceptance and rejection, is ______. (round off to two decimal places)

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 15

Open question
MNMCQ1 markNeeds review
The difference between depreciation and amortization allowances in tax calculation is that
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 37

Open question
MNNAT2 marksNeeds review
Production plan of a small quarry having 3 years of life is shown in the figure.
Diagram for Mining Engineering question 37

The following information of revenue and cost data are available. Ore: 3.0 million tonne each year; waste: 5.0 million m³ in the 1st year, 5.5 million m³ in the 2nd year, and 5.0 million m³ in the 3rd year. Selling price of ore = Rs. 150/tonne. Ore mining cost = Rs. 500/tonne. Waste mining cost = Rs. 500/m³. Initial capital = Rs. 1000 million. Discount rate = 10%. By neglecting depreciation, salvage value and corporate tax, the NPV of the mining project, in million Rs., is ______. [round off to 2 decimal places]

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 13

Open question
MNMCQ1 markNeeds review
The code for the lowest category of mineral resources under United Nations Framework Classification (UNFC) system is
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 35

Open question
MNNAT2 marksNeeds review
The selling price of one rock bolt (in Rs.) is given as,

, where

is the number of bolts produced. The manufacturing cost of rock bolts has a fixed component of Rs. 1500, and a variable component of Rs. 100 per bolt. The minimum break-even production, in number of rock bolts, is ________ (round off to 1 decimal place).

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 5

Open question
MNMCQ1 markNeeds review
As per classification of mineral resources “reserve” means
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 33

Open question
MNMCQ2 marksNeeds review
The net annual cash flows for two small scale mining projects A and B are given below. The correct decision assuming 10% discount rate as per NPV criterion is
Annual Cash flow (in Rs. Crore)
Period in years
Project A
Project B
0
-200
-300
1
0
0
2
200
100
3
140
150
4
0
200
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 33

Open question
MNNAT2 marksNeeds review
Cash flow of a project of duration 4 years is shown. The uniform income ‘R’, in Rs. crores, at the end of 2nd, 3rd and 4th year for an internal rate of return of 10% is ______________.
Diagram for Mining Engineering question 33


Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 35

Open question
MNNAT2 marksNeeds review
Economic feasibility of two methods is examined for meeting a targeted mine production. On a yearly basis, the following cost parameters (Rs in crores) are applicable for these methods.

Method 1
Method 2
Fixed cost
20
5
Variable cost
2X

The annual rate of production, ‘X’ in million tonnes for which both the methods will yield the same operating cost is ____________________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer