Question 42
Open questionMNMCQ2 marksNeeds review
Match the method of mining with orebody geometry, orebody strength and type of supports.
Geometry | Strength | Support | Method |
|---|---|---|---|
P. Tabular & Moderately Steep
Q. Tabular & Flat
R. Massive and Steep | L. Strong
M. Moderate
N. Weak | X. Unsupported
Y. Artificially Supported
Z. Self-supported | 1. Cut and Fill
2. Block Caving
3. Room and Pillar |
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 59
Open questionMNNAT2 marksNeeds review
A longitudinal section of a mined out stope block in a copper mine is shown by the shaded portion. For a uniform thickness of the stope block, the percentage of ore recovery is _____. (round off up to 2 decimals)

Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 64
Open questionMNNAT2 marksNeeds review
For a continuous miner (CM) panel, the following data are given.
Data related to CM
Dimension of a working face: 5.0 m (width) x 3.0 m (height)
Web depth, m: 0.6
Time for one web cut up to full height, min: 9
Data related to shuttle car
Bucket capacity of shuttle car, tonne: 10
Fill factor: 0.9
Number of cars: 2
Cycle time of each including loading, travel and unloading, min: 6
Assume, unit weight of coal is 1.4 tonne/m³ and its swell factor is 1.2. Consider, 6 working hours per shift.
The non-working time in min, in working hours per shuttle car to dispatch all coal cut by the CM, is _____. (round off up to 2 decimals)
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 20
Open questionMNMCQ1 markNeeds review
A tabular, near-flat (dip < 30°), and less than 2 m thick copper orebody having erratically located grade is to be mined underground. Wall rock and orebody are competent. The most suitable mining method is
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 45
Open questionMNNAT2 marksNeeds review
Data related to a surface miner operation are given below -
Drum width (m) = 3.0
Average cutting depth (cm) = 20
Average cutting speed (m/min) = 25
Length of pit (m) = 500
Turning time (min) = 2
Truck exchange time (s) = 30
Truck capacity (m³) = 15
Considering in situ volume, the production rate of the surface miner in m³/hr, is _____.
[rounded off to 1 decimal place]
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 46
Open questionMNNAT2 marksNeeds review
A continuous miner served by two shuttle cars produces 240 tonne/hr. The capacity of each shuttle car is 10 tonne. When a single shuttle car operates, the cycle time becomes 4 min. In case one of the shuttle cars is under break-down, the reduction in hourly production from that of two cars in percent is _____.
[rounded off to 1 decimal place]
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 22
Open questionMNMCQ1 markNeeds review
The bottom section of a stope block has dimensions 200 m × 40 m. If the modified RMR of rock mass is 50, the appropriate method of mining on the basis of Laubscher’s chart in the figure is

Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 36
Open questionMNMCQ2 marksNeeds review
Match the drilling pattern with mining operation

Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 55
Open questionMNNAT2 marksNeeds review
In a longwall face, the full seam thickness of 3 m is cut by a shearer with a web of depth 0.7 m. The hauling speed of shearer during cutting is 12 m/min. The trough cross-section of AFC is 0.4 m² and the average loading coefficient is 0.7. In order to evacuate coal from the face without spillage, the speed of AFC, in m/s is ______. (round off to one decimal place)
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 2
Open questionMNMCQ1 markNeeds review
Reusing method of mining is practiced for
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer