Production and Industrial Engineering
GATE PI format:nat PYQs
Build your understanding with focused practice from past exam papers.
Questions 11–20 of 264. Imported answers require independent review unless marked reviewed.
Question 56
Open questionPINAT2 marksNeeds review
A custom pinion, with a width equal to 10 times the module, has 20 full depth teeth and a pressure angle of 20° is being designed. It should transmit a torque of 95 N-m to a corresponding spur gear.
Considering the safe bending stress to be 180 MPa and form factor to be 0.32, the module of the pinion is _____ mm (rounded off to one decimal place).
Note: The Lewis equation gives the tangential force as
, where
is the safe bending stress,
the width,
the form factor, and
the module.Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 57
Open questionPINAT2 marksNeeds review
A company has a fixed cost of INR 3,00,000 and a variable cost of INR 150 per unit for manufacturing of a product. The company sells 5,000 units of that product making a profit equivalent to 20% of the total sales revenue.
The break-even quantity for that product is _____ units (rounded off to the nearest integer).
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 58
Open questionPINAT2 marksNeeds review
A company must allocate oil produced from their two plants to meet all the demands of two markets. The cost per litre of allocation from plant
to market
is denoted by
. The market demand
, plant production capacity
and
values are given in the table. | Market 1 ( ) | Market 2 ( ) | Capacity in litres |
|---|---|---|---|
Plant 1 ( ) | | | |
Plant 2 ( ) | | | |
Demand in litres | | | |
The company hired an intern to formulate an optimization model to decide on the quantity (
) to be allocated from plant
to market
and the formulation is given below:Minimize
Subject to
The optimal value of the objective function of the linear programming problem formulated by the intern is _____ (in integer).
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 59
Open questionPINAT2 marksNeeds review
The computer centre (CC) in an institute manages the central server for which researchers queue to run their computer programs. CC processes programs only one at a time. Four computer programs are available at 10:00 am on a given day. The time required to run each program on the central server and their respective promised time of completion (i.e., due date) on that same day are given in the table. If the CC follows shortest processing time (SPT) rule to sequence the computer programs, the number of tardy jobs is _____. Note: Ignore program change-over times.
Program | 1 | 2 | 3 | 4 |
|---|---|---|---|---|
Processing time (in minutes) | 60 | 40 | 90 | 100 |
Promised time (i.e., due date) | 12 noon | 11:30 am | 1:00 pm | 1:30 pm |
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 60
Open questionPINAT2 marksNeeds review
If
, and the value of
at
is 2, then the value of
at
is _____ (rounded off to two decimal places).Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 61
Open questionPINAT2 marksNeeds review
The number of soldering defects that occur in a semiconductor device follows a discrete Poisson distribution with a probability mass function
. The average number of soldering defects per semiconductor device is 3. The probability that a randomly selected semiconductor device will have at least two soldering defects is _____ (rounded off to two decimal places).Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 62
Open questionPINAT2 marksNeeds review
A time study was carried out for a job broken into two elements. For each element, three iterations of task were observed, and observed time was recorded. The observed times (in seconds) and the rating factor for each element are given in the table.
Work element | Observed time (seconds) | Rating factor |
|---|---|---|
A | 20; 25; 21 | 105% |
B | 19; 17; 18 | 90% |
If a further 20% needs to be added for allowances, then the standard output of the worker is _____ units per hour (in integer).
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 63
Open questionPINAT2 marksNeeds review
In a hole-shaft assembly, the following are the dimensions and tolerances (all in mm) provided for the hole and shaft:
Hole:
Shaft:
The magnitude of the clearance when the shaft is at the minimum material condition and hole is at the maximum material condition is _____ mm (to three decimal places).
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 64
Open questionPINAT2 marksNeeds review
Consider an assembly line producing an item through a process involving three activities in the following order: cutting, welding, and polishing. There are three workers available: one is assigned only for cutting, one is assigned only for welding, and one is assigned only for polishing.
The activity time per item is given in the table.
Assuming that the process is running in steady state, the total number of items coming out of the assembly line in six hours is _____ (in integer).
Note: Assume that workers, items, and machines/tools are available as and when needed.
Activity name | Cutting | Welding | Polishing |
|---|---|---|---|
Activity time/item (in minutes) | 30 | 40 | 25 |
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 65
Open questionPINAT2 marksNeeds review
In the composite filament winding process as shown in the figure, the mandrel diameter is 70 mm and is rotating at a speed,
rev/min.If a 45° helical wind angle is needed, the axial velocity,
, of the slider should be _____ m/s (rounded off to two decimal places).Assume
. Ignore the thickness of the composite layers already wound on the mandrel.
Note: Figure is not to scale.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer