Questions 21–24 of 24. Imported answers require independent review unless marked reviewed.

Topic practice 24 questionsPage 3 of 3

Question 15

Open question
PINAT1 markNeeds review
A Shewhart

-chart was developed for an in-control process. Considering the probability of a point falling outside the

control limits as 0.0026, the value of average run length for this chart is __________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 17

Open question
PIMCQ1 markNeeds review
The operating characteristic curves of three single sampling plans X, Y and Z with same lot size and acceptance number are shown in the Figure.
Diagram for Production and Industrial Engineering question 17

Considering the above operating characteristic curves, the correct relationship of the plans with respect to sample size is
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 43

Open question
PINAT2 marksNeeds review
Quality control department of a company maintains ‘c’ chart to assess the quality of laptops. In this process, twenty laptops are examined randomly. The number of nonconformities observed per laptop is given in the Table.
Laptop number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Number of nonconformities
1
3
7
4
10
6
1
5
4
3
6
4
2
7
4
2
9
8
5
2
Based on the data, the upper control limit for the ‘c’ chart is (up to two decimal places).

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 46

Open question
PINAT2 marksNeeds review
A firm manufactures capacitors using a specialized process. The desired specification for the capacitance is 40 ± 10 picofarads (pF). The process used is in statistical control. If the process mean is 41 pF and the estimated standard deviation is 3 pF, then the process capability index

is

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer