Question 39

Open question
PIMCQ2 marksNeeds review
A firm, with a production target of 50,000 units/year, has the following data for the selection of a new location for its plant:
Location
Fixed cost (Rs.)
Variable cost per unit (Rs.)
P
110,000
2
Q
95,000
2.5
R
80,000
3
S
75,000
3.5
The most economical location for the firm is
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 55

Open question
PINAT2 marksNeeds review
The layout for an AGV system is shown in figure. The loading time is 0.5 minutes and the unloading time is also 0.5 minutes. All distances are in meters.
Diagram for Production and Industrial Engineering question 55

Considering a vehicle velocity of 50 m/min, availability of 0.95 and traffic factor of 0.9, the number of vehicles required to satisfy a demand of 50 delivery/hour is ______

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 9

Open question
PIMCQ1 markNeeds review
The machines and auxiliary facilities are located according to processing sequence of the product (produced in very large quantities) in
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 46

Open question
PINAT2 marksNeeds review
A production line operates 7 hours a day in a 5-day week. The processing times for various job elements are as follows: | Job element: p, q, r, s, t | Processing time (s): 5, 10, 12, 3, 15 | If the line is designed for an output of 840 units per week, the theoretical minimum number of work stations required is _____

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 54

Open question
PINAT2 marksNeeds review
The annual demand of wrist watches produced on an assembly line is 1,03,125 units. The line operates 50 weeks/year, 5 shifts/week and 7.5 hours/shift. The uptime efficiency of the line is 99%. The cycle time (

) of the assembly line (in minutes/unit) is __________ (up to two decimal places).