How to practice topic:work-system-design

Attempt a question, record the concept and assumptions, then check the available answer. Rework mistakes after revising the relevant concepts. Topic tags can overlap; review the question context.

Questions 1–10 of 18. Imported answers require independent review unless marked reviewed.

Topic practice 18 questionsPage 1 of 2

Question 50

Open question
PIMSQ2 marksNeeds review
The operation chart of a method of assembling nuts and bolts for a left-handed operator has been illustrated in the figure.
Which ONE or MORE among the following options is/are CORRECT?
Diagram for Production and Industrial Engineering question 50

Your answerSelect all correct options. You can choose more than one.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 62

Open question
PINAT2 marksNeeds review
A time study was carried out for a job broken into two elements. For each element, three iterations of task were observed, and observed time was recorded. The observed times (in seconds) and the rating factor for each element are given in the table.
Work element
Observed time (seconds)
Rating factor
A
20; 25; 21
105%
B
19; 17; 18
90%
If a further 20% needs to be added for allowances, then the standard output of the worker is _____ units per hour (in integer).

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 19

Open question
PIMCQ1 markNeeds review
In a work sampling, out of

observations, a worker was sitting idle in

observations. The standard deviation of the mean proportion of idle time is given by
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 48

Open question
PINAT2 marksNeeds review
A worker is allowed half an hour personal time in a normal 8-hour shift. If the normal time for manufacturing a product is 5 minutes, the standard time (in second) is________. (Answer in integer)

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 21

Open question
PIMCQ1 markNeeds review
Which one of the following THERBLIGS does not advance the progress of the work and can be eliminated by applying the principles of motion economy?
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 22

Open question
PIMCQ1 markNeeds review
If work sampling is carried out using a large number of observations, then the required sample size is estimated using
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 61

Open question
PINAT2 marksNeeds review
In a time study, the average time taken for packing a product in a warehouse by a worker with 120% performance rating is observed as 9 minutes. Assuming an allowance of 10% of the standard time, the standard time (in minutes) for packing is ________. (Answer in integer)

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 42

Open question
PIMCQ2 marksNeeds review
Match the recording techniques used in method study with the most appropriate application areas.
Recording technique: P—Outline process chart; Q—String diagram; R—Multiple activity chart; S—Two-handed process chart.
Application area: 1—Factory layout – movement of workers; 2—Gang work; 3—Complete manufacturing sequence of a product; 4—Manual assembly of nuts and bolts.
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 50

Open question
PINAT2 marksNeeds review
The work sampling study, with 100 observations, revealed 25 % idle time of a worker. The number of observations required for ±10 % accuracy and 95.45 % confidence level is _____ (in integer).

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 21

Open question
PIMCQ1 markNeeds review
Match the symbols with their meanings.
Therbl symbol: P
Diagram for Production and Industrial Engineering question 21

; Q
Diagram for Production and Industrial Engineering question 21 (figure 2)

; R
Diagram for Production and Industrial Engineering question 21 (figure 3)

; S
Diagram for Production and Industrial Engineering question 21 (figure 4)

. Meaning: 1 Rest for overcoming fatigue; 2 Avoidable delay; 3 Inspect; 4 Search.
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer