Questions 11–18 of 18. Imported answers require independent review unless marked reviewed.

Topic practice 18 questionsPage 2 of 2

Question 60

Open question
PINAT2 marksNeeds review
A time study engineer recorded the cycle time (in minute) for machining of a component. The recorded time study data is provided in the table. The performance rating of the worker is 110%. The standard time for machining (in minute) the component by assuming 10% allowance is____________. [round off to nearest integer]
Time study data
Cycle time (minute) | Frequency 42 | 1 43 | 2 44 | 3 45 | 2 46 | 1

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 40

Open question
PINAT2 marksNeeds review
A time study is carried out for a spot welding operation which is being performed by an operator. The time taken (in seconds) for five observations are recorded as 40, 35, 45, 37 and 43, respectively. If the standard time and the allowance for this operation are 45 seconds and 9 seconds, respectively, then the performance rating (in percentage) of the operator is ________. [in integer]

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 55

Open question
PINAT2 marksNeeds review
In a work study experiment, it is observed that a worker completes a job in an average time of 15 minutes with a performance rating of 120%. The time required for another worker having a performance rating of 80% to complete the same job (rounded off to one decimal place) in minutes is ____________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 24

Open question
PINAT1 markNeeds review
In a work study experiment, normal time was recorded as 140 s with a rating of 100%. Considering 2% allowance, the standard time (in s) is _____ (round off to 1 decimal place)

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 38

Open question
PIMCQ2 marksNeeds review
The man-hours required (

) to manufacture the

unit in a plant is given by

, where

at the 80% learning rate. If the manufacturing time for the first unit (

) is 80 man-hours, the total time (in man-hours) required to manufacture the first 4 units, at 80% learning rate, is
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 7

Open question
PIMCQ1 markNeeds review
In ASME process chart, the symbol □ represents
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 47

Open question
PINAT2 marksNeeds review
In a work sampling study of a worker, the information available are as follows: total time of study: 30 hour, number of items produced: 320, total number of observations: 100, number of observations when worker is found working: 80 and average performance rating: 105%. Company policy is to give allowance of 10% of total time on the job. The standard time (in minute per item, up to one decimal place) for manufacturing the item is _____

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 11

Open question
PIMCQ1 markNeeds review
Match the ASME process chart symbols with their correct description
Symbols: P. ○; Q. →; R. □; S. ▽; T. D
Description: 1. STORAGE; 2. TRANSPORTATION; 3. OPERATION; 4. DELAY; 5. INSPECTION
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer