Question 28
Open questionARNAT1 markNeeds review
A ramp with a slope of 1:12 is required for wheelchair access. Intermediate landings of length 1.5 m each have to be provided after every 9 m running length. The running length of a straight ramp including landing, to negate a level difference of 900 mm vertical height, in m, is ____________ (round off to two decimal places).
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 29
Open questionARMCQ2 marksNeeds review
Match the features in Group-I with the corresponding software tools in Group-II.
Group-I
(P) Raster Graphics Editing
(Q) Energy Modeling
(R) Visual Programming Interface
(S) Structural Analysis
Group-II
(1) OpenStudio
(2) GIMP
(3) STAAD
(4) Grasshopper
(5) Radiance
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 30
Open questionARMCQ2 marksNeeds review
Match the elements in Group-I with the corresponding buildings in Group-II.
Group-I
(P) Lightweight Structure
(Q) Base Isolator
(R) Tuned-mass Damper
(S) Diagrid
Group-II
(1) Taipei 101, Taipei by Lee and Wang
(2) The Gherkin, London by Foster & Partners
(3) Museum of New Zealand Te Papa Tongarewa, Wellington by Ivan Mercep
(4) Paper Log Houses, Kobe by Shigeru Ban
(5) Metropolitan Cathedral of Christ the King, Liverpool by Lutyens and Gibberd
Your answerChoose one option.