The table shows the activities and their durations and dependencies in a project.
Activity
Duration (Days)
Depends on
A
8
-
B
4
A
C
4
B
D
4
C, L
F
4
A
G
4
F
H
6
G, L
K
10
A
L
6
F, K
The total duration (in days) of the project is ________ (in integer).

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 53

Open question
CE2NAT2 marksNeeds review
A homogeneous earth dam has a maximum water head difference of 15 m between the upstream and downstream sides. A flownet was drawn with the number of potential drops as 10 and the average length of the element as 3 m. Specific gravity of the soil is 2.65. For a factor of safety of 2.0 against piping failure, void ratio of the soil is ________ (rounded off to 2 decimal places).

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 54

Open question
CE2NAT2 marksNeeds review
The in-situ percentage of voids of a sand deposit is 50%. The maximum and minimum densities of sand determined from the laboratory tests are 1.8 g/cm

and 1.3 g/cm

, respectively. Assume the specific gravity of sand as 2.7.
The relative density index of the in-situ sand is __________ (rounded off to 2 decimal places).

Log in to check the answer