Complete GATE PI 2018 Paper 1 overview, original pages and practice · Timed previous-paper practice

Questions 43–45 of 65. Imported answers require review unless explicitly marked reviewed.

Paper practice 65 questionsPage 15 of 22

Question 33

Open question
PIMCQ2 marksNeeds review
In a mass production firm, measurements are carried out on 1000 pairs of shaft and hole. The mean diameters of the shaft and the hole are 37.53 mm and 37.59 mm, respectively. The corresponding standard deviations are 0.03 mm and 0.04 mm. The mean clearance and its standard deviation (both in mm), respectively, are
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 34

Open question
PIMCQ2 marksNeeds review
A pressure die casting set-up was tested by injecting water (density 1000 kg/m

) at a pressure of 200 bar. Mould-filling time was found to be 0.05 s. Afterward, the actual casting is made by injecting the liquid metal (density 2000 kg/m

) at an injection pressure of 400 bar. Neglect all losses (friction, viscous-effect, etc.). The approximate mould-filling time (in s) is
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 35

Open question
PINAT2 marksNeeds review
The value of the surface integral

over the surface S of the sphere

, where n is the unit outward normal to the surface element dS, is _____

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer