Production and Industrial Engineering
2020 · Paper 1
Take it one question at a time. Try an answer, then check your understanding.
Complete GATE PI 2020 Paper 1 overview, original pages and practice · Timed previous-paper practice
Questions 43–45 of 65. Imported answers require review unless explicitly marked reviewed.
Question 33
Open questionPIMCQ2 marksNeeds review
A company manufactures products P and Q in quantities
and
, respectively, using two resources. The following Linear Programming Problem (LPP) is formulated to maximize the profit Z.Maximize
subject to
(for Resource 1)
(for Resource 2)
and
.The shadow price for Resource 2 is
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 34
Open questionPIMCQ2 marksNeeds review
A rectifying inspection is performed on a lot of size
using a Single-Sampling Plan with the sample size
and the acceptance number
. If the Acceptable Quality Level is 1.0%, the producer’s risk associated with the sampling plan (rounded off to the nearest integer) in % isYour answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 35
Open questionPINAT2 marksNeeds review
For
, the value of
using Simpson’s
rule with two intervals (rounded off to two decimal places) is __________.Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer