Question 36
Open questionPIMCQ2 marksNeeds review
A circular tank of 4 m diameter is filled up to a height of 3 m. Assuming almost steady flow and neglecting losses, the time taken in seconds to empty the tank through a 5 cm diameter hole located at the center bottom (take acceleration due to gravity g = 9.81 m/s²) is [round off to the nearest integer]
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 37
Open questionPINAT2 marksNeeds review
The probability mass function
of a discrete random variable X is given by
, where x = 1, 2, ···, ∞. The expected value of X is _________. [in integer]Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 38
Open questionPINAT2 marksNeeds review
The time to pass through a security screening at an airport follows an exponential distribution. The mean time to pass through the security screening is 15 minutes. To catch the flight, a passenger must clear the security screening within 15 minutes. The probability that the passenger will miss the flight is _________. [round off to 3 decimal places]
Log in to check the answer