Question 8
Open questionCEMCQ1 markNeeds review
As per IS 456:2000, the pH value of water for concrete mix shall NOT be less than
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 9
Open questionCEMCQ1 markNeeds review
The Los Angeles test for stone aggregates is used to examine
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 7
Open questionCEMCQ1 markNeeds review
If the fineness modulus of a sample of fine aggregates is 4.3, the mean size of the particles in the sample is between
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 21
Open questionCENAT1 markNeeds review
The characteristic compressive strength of concrete required in a project is 25
and the standard deviation in the observed compressive strength expected at site is 4
. The average compressive strength of cubes tested at different water-cement (
) ratios using the same material as is used for the project is given in the table. (%) | 45 | 50 | 55 | 60 |
|---|---|---|---|---|
Average compressive strength of cubes ( ) | 35 | 25 | 20 | 15 |
The water-cement ratio (in percent, round off to the lower integer) to be used in the mix is ______
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 37
Open questionCENAT2 marksNeeds review
The network of a small construction project awarded to a contractor is shown in the following figure. The normal duration, crash duration, normal cost, and crash cost of all the activities are shown in the table. The indirect cost incurred by the contractor is INR 500 per day. If the project is targeted for completion in 16 days, the total cost (in INR) to be incurred by the contractor would be ________.

Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 38
Open questionCENAT2 marksNeeds review
A box measuring
is filled to the top with dry coarse aggregate of mass 187.5 kg. The water absorption and specific gravity of the aggregate are 0.5% and 2.5, respectively. The maximum quantity of water (in kg, round off to 2 decimal places) required to fill the box completely is ________.Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 5
Open questionCEMCQ1 markNeeds review
The setting time of cement is determined using
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 6
Open questionCEMCQ1 markNeeds review
The Le Chatelier apparatus is used to determine
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 7
Open questionCEMCQ1 markNeeds review
The deformation in concrete due to sustained loading is
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 18
Open questionCENAT1 markNeeds review
The frequency distribution of the compressive strength of 20 concrete cube specimens is given in the table:
f (MPa) | Number of specimens with compressive strength equal to f |
|---|---|
23 | 4 |
28 | 2 |
22.5 | 5 |
31 | 5 |
29 | 4 |
If
is the mean strength of the specimens and
is the standard deviation, the number of specimens (out of 20) with compressive strength less than
is ______Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer