Questions 11–17 of 17. Imported answers require independent review unless marked reviewed.

Topic practice 17 questionsPage 2 of 2

Question 33

Open question
MEMCQ2 marksNeeds review
For an assembly line, the production rate was 4 pieces per hour and the average processing time was 60 minutes. The WIP inventory was calculated. Now, the production rate is kept the same, and the average processing time is brought down by 30 percent. As a result of this change in the processing time, the WIP inventory
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 33

Open question
MEMCQ2 marksNeeds review
The forecast for the monthly demand of a product is given in the table below.
Month
Forecast
Actual Sales
1
32.00
30.00
2
31.80
32.00
3
31.82
30.00
The forecast is made by using the exponential smoothing method. The exponential smoothing coefficient used in forecasting the demand is
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 17

Open question
MEMCQ1 markNeeds review
The table presents the demand of a product. By simple three-months moving average method, the demand-forecast of the product for the month of September is
Month
Demand
January
450
February
440
March
460
April
510
May
520
June
495
July
475
August
560
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 16

Open question
MEMCQ1 markNeeds review
The time series forecasting method that gives equal weight to each of the m most recent observations is
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 52

Open question
MENAT2 marksNeeds review
Processing times (including setup times) and due dates for six jobs waiting to be processed at a work centre are given in the table. The average tardiness (in days) using shortest processing time rule is ________ (correct to two decimal places).
Job
Processing time (days)
Due date (days)
A
3
8
B
7
16
C
4
4
D
9
18
E
5
17
F
13
19

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 20

Open question
ME-1MCQ1 markNeeds review
Cylindrical pins of diameter

are being produced on a machine. Statistical quality control tests show a mean of

and standard deviation of

. The process capability index

is
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 52

Open question
ME-1NAT2 marksNeeds review
Following data refers to the jobs (P, Q, R, S) which have arrived at a machine for scheduling. The shortest possible average flow time is ________ days.
Job
Processing Time (days)
P
15
Q
9
R
22
S
12

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer