Question 35

Open question
MNNAT2 marksNeeds review
Economic feasibility of two methods is examined for meeting a targeted mine production. On a yearly basis, the following cost parameters (Rs in crores) are applicable for these methods.

Method 1
Method 2
Fixed cost
20
5
Variable cost
2X

The annual rate of production, ‘X’ in million tonnes for which both the methods will yield the same operating cost is ____________________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 36

Open question
MNNAT2 marksNeeds review
A person standing 50 m away from an HEM experiences 90 dB sound pressure level. If the person moves to a new location that is 70 m away from the HEM, the sound pressure level experienced by the person, in dB, becomes ____________________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 37

Open question
MNNAT2 marksNeeds review
A portion of a ventilation system has two splits as shown. Split ‘A’ has a resistance of

and a regulator of size 2.0

. The resistance of split ‘B’ in

is _________.
Diagram for Mining Engineering question 37


Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 38

Open question
MNNAT2 marksNeeds review
Air enters a bord and pillar panel at 10 ppm CO and 20.78% O

. The air at the panel return has 80 ppm CO and 20.52% O

. The ‘Graham’s ratio’ for the status of fire in the panel in % is ____________________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 39

Open question
MNNAT2 marksNeeds review
In a sublevel stope, 20 m high excavation is made with ring drilling in a 6 m wide orebody. In an effective shift time of 6 hrs, three rings are blasted resulting in 9 m extraction length. LHDs of 5.0

bucket capacity and cycle time of 5 minutes are used for ore transportation. The number of LHDs required for this operation is _________________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 40

Open question
MNNAT2 marksNeeds review
A coal seam lying at a depth of 200 m is developed by bord and pillar method. Pillars are 30 m centre to centre with a gallery width of 4 m. Unit weight of the overlying strata is 28

. If the pillar strength is 9.32 MPa, the factor of safety of pillar is ___________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 41

Open question
MNNAT2 marksNeeds review
Following information about a longwall retreating panel is given. Panel length = 1800 m Face length = 150 m Depth of web = 0.6 m Shearer travels at a speed of 1.5 m/min along the face. Each cutting cycle requires a non-operational time of 2 h 20 min. The panel is fully extractable. The number of working days required to extract the panel is ______________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 42

Open question
MNNAT2 marksNeeds review
In a direct rope haulage operating along a 1500 m long incline, 180 tonne of coal is hauled in 7 hours. The average rope speed is 7.5 km/h. The set changing time for the tubs is 2 minutes each at the top and bottom of the incline. If the tub capacity is 1.0 tonne, the number of tubs in the set is ____________________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 43

Open question
MNNAT2 marksNeeds review
An SDL of 1.0 tonne capacity operates with a cycle time of 6 minutes. The dimension of the face is 4 m x 3 m. Five blasts are conducted per shift with an average pull of 1.2 m. If the density of blasted coal is 0.8 tonne/m

, the time required by the SDL in the shift to lift all the prepared coal in hours is ____________________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 44

Open question
MNNAT2 marksNeeds review
A force diagram is shown below. Considering clockwise moments to be positive, the resultant moment about A in Nm is ________________.
Diagram for Mining Engineering question 44


Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer