Mining Engineering
GATE MN Mine Planning PYQs
Build your understanding with focused practice from past exam papers.
How to practice Mine Planning
Attempt a question, record the concept and assumptions, then check the available answer. Rework mistakes after revising the relevant concepts. Topic tags can overlap; review the question context.
Questions 1–10 of 28. Imported answers require independent review unless marked reviewed.
Question 16
Open questionMNMCQ1 markNeeds review
As per the UNFC mineral resources classification system, the highest category of resource is indicated by
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 46
Open questionMNNAT2 marksNeeds review
The borehole data for resource estimation for an iron ore deposit are shown. The average grade of the deposit, in %, is ____________. (rounded off to two decimal places)
Plan view: A1 = 0.02 km², A2 = 0.03 km², A3 = 0.04 km². Borehole sections: D1 has 6 m at 63% and 6 m at 66%; D2 has 6 m at 60% and 4 m at 64%; D3 has 8 m at 64% and 7 m at 62%. Index: D1 to D3: Exploratory Borehole ID; A1 to A3: Corresponding Polygonal Area.

Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 18
Open questionMNMCQ1 markNeeds review
The spherical semivariogram model
is represented by the following expression, where h is the lag distance.
The parameters
,
and
are respectively known asYour answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 25
Open questionMNMCQ1 markNeeds review
The percentage Fe and corresponding net value for an iron ore mine is given below:
Fe (%) | Net value (INR per tonne) |
|---|---|
58 | 4000 |
62 | 4500 |
Assuming net value versus grade curve to be a straight line, and mining cost of waste is INR 1000 /m
, the correct representation of stripping ratio, SR (m
/tonne versus Fe (%) grade curve isYour answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 32
Open questionMNNAT1 markNeeds review
For a circular path of radius 300 m, the super elevation is restricted to 0.1 m for a width of 1.6 m. The maximum speed, in m/s, of vehicle to avoid overturn is ____. (round off up to 2 decimals)
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 36
Open questionMNMCQ2 marksNeeds review
Data from two production faces of an open pit iron ore mine are given.
Item description | Face 1 | Face 2 |
|---|---|---|
Maximum production capacity (tonne/day) | 1600 | 2000 |
Fe (%) | 63 | 58 |
Production cost of ores (in INR/tonne) | 1500 | 1200 |
Ores from two different faces are blended and supplied with Fe grade not less than 60 %. Based on the demand, the combined production is limited to a maximum of 2500 tonne/day. If the selling price of blended iron ores is INR 4500 /tonne, the optimal production from two faces in tonne/day, for maximizing the profit, respectively are
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 58
Open questionMNNAT2 marksNeeds review
In an open pit mine, the mineral inventory, prices, costs and capacities are given.
Mineral inventory
Grade interval | Tonnage (in million tonne) |
|---|---|
0 < Cu% ≤ 0.3 | 0 |
0.3 < Cu% ≤ 0.4 | 5 |
0.4 < Cu% ≤ 0.5 | 5 |
0.5 < Cu% ≤ 0.6 | 5 |
0.6 < Cu% ≤ 0.7 | 5 |
0.7 < Cu% ≤ 0.8 | 5 |
0.8 < Cu% | 0 |
Concentrating cost : INR 3,200/tonne of ore milled
Smelting & refinery cost : INR 10,000/tonne of copper metal
Selling price : INR 6,50,000/tonne of copper metal
Overall recovery : 100%
Maximum production capacity : 5 million tonne/annum
The mine is operating at 5 million tonne in a year. Considering mine capacity being the only constraint, Lane’s algorithm (based on profit maximization) is used for determining mill cut-off grade. The total amount of copper produced in million tonne, in the life of the pit, is _____. (round off up to 2 decimals)
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 36
Open questionMNMCQ2 marksNeeds review
In a quality control process of coal supplied to a thermal plant, the 3-sigma control limits for fixed carbon (FC) are defined by 40% ± 15%. The process is termed “out of control” if:
Rule 1: 4 out of 5 successive values of FC are situated at the same side of the mean and at a distance more than 1 standard deviation.
Rule 2: Any one value crosses any of the 3-sigma control limits.
For the following continuous data of FC (%): 49, 51, 56, 20, 46, 48, 47, 49, 45, 41, 42, 40, the process is
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 61
Open questionMNNAT2 marksNeeds review
A mining company makes an initial investment of Rs 200 crore on a project.
The following data are available:
Production life : 3 years
Year wise production after gestation period (Mtonne) : 1.0, 2.0, and 1.0
Stripping ratio : 1.5 m³/tonne
Selling price of ore : Rs. 200 per tonne
Ore mining cost : Rs. 500 per tonne
Waste mining cost : Rs. 500 per m³
Discount rate : 10%
By ignoring any other cash-flows, if the NPV of the project becomes Rs. 5.367 crore, the gestation period of the project, in years is _____.
[rounded off to the nearest integer]
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 15
Open questionMNMCQ1 markNeeds review
A deposit has the grade attribute
with a density function
. For a cut-off grade
, the proportion of the ore in the deposit is given byYour answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer