Production and Industrial Engineering
GATE PI Production control PYQs
Build your understanding with focused practice from past exam papers.
Questions 11–20 of 32. Imported answers require independent review unless marked reviewed.
Question 29
Open questionPINAT1 markNeeds review
The standard time for completing a job on a machine is 10 minutes. Number of machines available is 5, each machine is available for 300 hours/month, and average machine utilization is 80 %. The maximum number of jobs that can be produced in a month is _____ (in integer).
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 40
Open questionPIMCQ2 marksNeeds review
Six jobs (1, 2, 3, 4, 5, 6) undergo drilling, followed by reaming operation. The time required for each operation is given as
Job | Drilling (min) | Reaming (min)
1 | 30 | 45
2 | 30 | 15
3 | 60 | 40
4 | 20 | 25
5 | 35 | 28
6 | 45 | 70
The sequence of processing the jobs, using the Johnson’s rule, is
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 51
Open questionPINAT2 marksNeeds review
The information of two products P and Q is given as
Product | Annual demand (units) | Order cost per order (Rupees) | Holding cost per unit per year (Rupees) |
|---|---|---|---|
P | 2500 | 60 | 30 |
Q | 3600 | 80 | 40 |
The value of
is _____ (round off to 2 decimal places).Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 59
Open questionPINAT2 marksNeeds review
A company procures 384 parts annually. The annual holding cost per part is ₹ 30. If the ordering cost is ₹ 1000, then the economic order quantity is____________. [in integer]
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 61
Open questionPINAT2 marksNeeds review
A machine component is to be processed at 5 workstations sequentially. The table provides the cycle time (in second) of each workstation. In mass production, the number of components produced per hour (in steady state) is____________. [in integer]
Workstation | Cycle time of each workstation (second)
WS-1 | 85
WS-2 | 55
WS-3 | 90
WS-4 | 65
WS-5 | 70
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 65
Open questionPINAT2 marksNeeds review
A company forecasts the weekly demand of oxygen cylinders using exponential smoothing method with smoothing constant
. The actual demands in Week 1, Week 2, Week 3 and Week 4 were 375, 412, 592 and 439 units, respectively. The forecasted demand for Week 3 was 500 units. The forecast (in unit) for the Week 5 is____________. [in integer]Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 5
Open questionPIMCQ1 markNeeds review
Which one of the following is NOT a measure of forecast error?
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 30
Open questionPIMCQ2 marksNeeds review
In the classical economic order quantity (EOQ) model, let
and
denote the optimal order quantity and the corresponding minimum total annual cost (the sum of the inventory holding and ordering costs). If the order quantity is estimated incorrectly as
, then the corresponding total annual cost
isYour answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 39
Open questionPINAT2 marksNeeds review
A machine shop has received four jobs A, B, C and D for processing on a single CNC machine. All jobs are available for processing on the first day of the production schedule calendar, and processing times and due dates as applicable on the first day are given below. Using earliest due date rule, the average tardiness (in days) is ________. [in integer]
Job | Processing time (in days) | Due date (day) |
|---|---|---|
A | 8 | 14 |
B | 5 | 10 |
C | 7 | 12 |
D | 9 | 19 |
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answerQuestion 19
Open questionPIMCQ1 markNeeds review
Which of the following is a causal forecasting method?
Your answerChoose one option.
Log in to check the answer
You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer