Questions 621–630 of 650. Imported answers require independent review unless marked reviewed.

Topic practice 650 questionsPage 63 of 65

Question 36

Open question
PIMCQ2 marksNeeds review
A schematic diagram of peripheral milling is shown in the Figure.
Diagram for Production and Industrial Engineering question 36

If

is the depth of cut and

is the diameter of the milling cutter, then the length of approach (

) is expressed as
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 37

Open question
PIMCQ2 marksNeeds review
An electrical appliances showroom sells 2,400 ceiling fans in one year (52 weeks). The holding cost is 10 % of the cost of the ceiling fan. The cost of one ceiling fan is Rs. 600. The cost incurred for placing an order is Rs. 201. There is a lead time of 5 weeks. The economic order quantity (EOQ) and the reorder level, respectively (rounded to the next higher integer) are
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 38

Open question
PINAT2 marksNeeds review
In a calendar year, the demand forecast of motorbikes for the month of June is 200. The actual demand of motorbikes for the month of June and July are 300 and 350, respectively. If single exponential smoothing method with smoothing constant 0.7 is used, then the demand forecast for the month of August is

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 39

Open question
PINAT2 marksNeeds review
In a project, tasks A, B, C, D, E, F, G, H, I and J are to be performed. The precedence relationships and the time required (in days) to complete the tasks are given in the Table.
Tasks
A
B
C
D
E
F
G
H
I
J
Time (days)
8
10
8
10
16
17
18
14
9
4
Preceding tasks
-
-
-
A
A
B, D
C
C
F, G
E, I, H
The time required (in days) to complete the project along the critical path is

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 40

Open question
PINAT2 marksNeeds review
The potential production alternatives for manufacturing a product along with their unit cost and monthly capacity are given in the Table.
S. No.
Production Alternatives
Unit cost (Rs.)
Capacity / month
1
Regular time production
5
300
2
Overtime production
6
200
3
Subcontracting
10
500
The inventory at the end of July is 100 units. If the demand for the month of August is 620, then the minimum total cost (in Rs.) to meet the demand is

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 41

Open question
PIMCQ2 marksNeeds review
The preparatory and miscellaneous codes used in CNC part programming and the functions are given in the Table.
Group I
Group II
P. G01
1. Circular interpolation, counter-clock wise
Q. G03
2. End of program
R. M06
3. Tool change
S. M02
4. Linear interpolation
The correct combination of code and the respective function is
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 42

Open question
PINAT2 marksNeeds review
A surface of 30 mm × 30 mm of an iron block is machined using electrochemical machining process. The atomic weight and valency of iron is 55.85 and 2, respectively. The density of iron is 7,860 kg/m

. If input current is 1,000 A and Faraday’s constant is 96,540 Coulombs, then the feed rate (in mm/min) is (up to two decimal places).

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 43

Open question
PINAT2 marksNeeds review
Quality control department of a company maintains ‘c’ chart to assess the quality of laptops. In this process, twenty laptops are examined randomly. The number of nonconformities observed per laptop is given in the Table.
Laptop number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Number of nonconformities
1
3
7
4
10
6
1
5
4
3
6
4
2
7
4
2
9
8
5
2
Based on the data, the upper control limit for the ‘c’ chart is (up to two decimal places).

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 44

Open question
PIMCQ2 marksNeeds review
The Merchant circle diagram showing values forces associated with a cutting process using a wedge-shaped tool is given in the Figure.
Diagram for Production and Industrial Engineering question 44

The coefficient of friction can be estimated from the ratio
Your answerChoose one option.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 45

Open question
PINAT2 marksNeeds review
An air conditioner unit is expected to run continuously. The mean time between failures (MTBF) for this unit is 2,000 hours and the mean time to repair (MTR) is 48 hours. The availability of the air conditioning unit is (up to three decimal places).

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer