Question 41

Open question
MNNAT2 marksNeeds review
Following information about a longwall retreating panel is given. Panel length = 1800 m Face length = 150 m Depth of web = 0.6 m Shearer travels at a speed of 1.5 m/min along the face. Each cutting cycle requires a non-operational time of 2 h 20 min. The panel is fully extractable. The number of working days required to extract the panel is ______________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 42

Open question
MNNAT2 marksNeeds review
In a direct rope haulage operating along a 1500 m long incline, 180 tonne of coal is hauled in 7 hours. The average rope speed is 7.5 km/h. The set changing time for the tubs is 2 minutes each at the top and bottom of the incline. If the tub capacity is 1.0 tonne, the number of tubs in the set is ____________________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 43

Open question
MNNAT2 marksNeeds review
An SDL of 1.0 tonne capacity operates with a cycle time of 6 minutes. The dimension of the face is 4 m x 3 m. Five blasts are conducted per shift with an average pull of 1.2 m. If the density of blasted coal is 0.8 tonne/m

, the time required by the SDL in the shift to lift all the prepared coal in hours is ____________________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 44

Open question
MNNAT2 marksNeeds review
A force diagram is shown below. Considering clockwise moments to be positive, the resultant moment about A in Nm is ________________.
Diagram for Mining Engineering question 44


Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 45

Open question
MNNAT2 marksNeeds review
The experiment to determine permeability of a soil sample is illustrated below. The cross-sectional area of the sample is 20.0

. The permeability of the soil sample in cm/s is ____________.
Diagram for Mining Engineering question 45


Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 46

Open question
MNNAT2 marksNeeds review
In underground face blasting, the pull is found to be 10% less than the drillhole length. The headings of 3.6 m width are supported by prop density of 1.44/m

. The hole length is 1.5 m, and 6 rounds of blasting are done in the panel per shift. The number of props to be erected in a shift is ____________________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 47

Open question
MNNAT2 marksNeeds review
The immediate roof of a mine is supported by bolts of length 1.5 m, arranged in 1.2 m x 1.2 m grid pattern. If the unit weight of roof rock is 2.25 tonne/m

and load carrying capacity of each bolt is 7.5 tonne, the factor of safety of the support system is ________________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 48

Open question
MNNAT2 marksNeeds review
In a level terrain, a vertical orebody of 20 m uniform width is worked by surface mining method. The density of the ore is 2.5 tonne/m

. The ultimate pit has a depth of 60 m, width of 20 m at pit bottom, and a pit slope of 45°. The overall stripping ratio for this condition in m

/tonne is ____________________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 49

Open question
MNNAT2 marksNeeds review
A 20 m long steel tape used for survey is found to be short by 10 cm. If the area measured with the steel tape is 500

, the actual area in

is ____________________.

Log in to check the answer

You can attempt this question now. Sign in to view the answer key, explanations and discussion.Log in to check answer

Question 50

Open question
MNNAT2 marksNeeds review
The following figure shows the designed blast pattern of a bench. The explosive column is charged at 18 kg/m. If the unit weight of the blasted material is 2.5 tonne/m

, the powder factor for the blast in tonne/kg is ____________.
Diagram for Mining Engineering question 50